Verification of Installation

All steel RMC, IMC and EMT systems shall be electrically and mechanically continuous, and shall be tested after conductor installation to ensure continuity. Simple continuity tests are permitted, but shall be made between the service panel and the last outlet in each branch circuit.

linkedIn Path